Main content

Alert message

Aqueduc travaux

IMPORTANT NOTICE - MAJOR WORK ON THE WATER DISTRIBUTION SYSTEM

This is to inform you that the Town of Hawkesbury must proceed with the replacement of a water distribution system valve this Thursday, July 7, 2022, between 8 a.m. and 4 p.m., at the intersection of Kipling Street and Main Street West. Please follow the signs in order to detour the work zone.

Because this replacement is major work, as a precaution, we advise the entire town that there could be for a brief moment, a drop in water pressure, with or without a cloudy or reddish (rust) coloration of the water. note that this colouration does not pose any risk to your health.

If your water is cloudy or coloured, leave the cold-water taps running until the water returns clear. This should take no longer than 5 minutes.

It should also be noted that during this period, there will be a temporary interruption of drinking water for the following addresses:

280 TO 400 MAIN STREET WEST

226 TO 434 KIPLING STREET

368 TO 430 NELSON STREET WEST

325 KITCHENER STREET

We thank you for your understanding and your cooperation and we apologize for the inconveniences related to this work, which is necessary for the water distribution system.

NOTE: The work will be postponed to a later date if weather conditions are unfavourable.